Aditya Kumar Anupam - Research Supervision
(Civil Engineering)
Research Supervision
Programme Name Scholar Name Research Topic Status From To Suprivisor(s) Co-Superivisor
M.Tech Shah Alam Reclaimed Asphalt pavement material on physical and rheological properties of bitumen Completed  2019-08-01 2021-07-15 A. K. Anupam NIL
M.Tech Pooja Sing Study of PCI prioritization method for maintenance and rehabilitation Completed  2019-08-01 2021-07-15 A. K. Anupam NIL
M.Tech Murtaza Ali Akbar Use of slate waste Aggregate as Base/sub-basematerial Completed  2019-08-01 2021-07-15 A. K. Anupam NIL
M.Tech Anurag Kumar Kaushal Use of recycled polyethylene terephthalate fibre withcalcium carbide residue in subgrade improvement Completed  2019-08-01 2021-07-15 A. K. Anupam NIL
M.Tech K Sandeep Evaluation of physical and rheological properties of SBS and CR modified bitumen Completed  2018-08-01 2020-07-15 A. K. Anupam NIL
M.Tech Himanshu Bharti Utilization of waste pine needle in soil subgrade/sub-base layer Completed  2018-08-01 2020-07-15 A. K. Anupam NIL
M.Tech Gyan Ranjan Analytical analysis of effectiveness of geogrid in clayey-silt soil by pull-out test Completed  2018-08-01 2020-07-15 A. K. Anupam NIL
M.Tech Anshul Kumar Performance analysis of flexible pavement using HDM-4 Completed  2018-08-01 202021-07-15 A. K. Anupam Yogesh Sah
M.Tech Amanraj Singh Parmar Performance characteristics and effect of gradation onhot mix asphalt and cold mix asphalt Completed  2018-08-01 2020-07-15 A. K. Anupam NIL
M.Tech Vishwajeet Singh Utilization of Waste Foundry Sand in Base and Sub-base Layer Completed  2017-08-01 12019-07-15 A. K. Anupam NIL
M.Tech Hitesh Patel Effect of Aggregate proportion and Geogrid on PreviousConcrete for Low Volume Roads Completed  2017-08-01 2019-07-15 A. K. Anupam NIL
M.Tech Nabin Bhuyan Effect of Metakaoline on Cement Treated Clayey Silt Soil Completed  2017-08-01 2019-07-15 A. K. Anupam NIL
M.Tech Rajat KumarKeshari Utilization of Fly ash and Silica fume as a partialReplacement of Cement In rigid Pavement Construction Completed  2016-08-01 2018-07-15 A. K. Anupam NIL
M.Tech SudhirNarayanBharti Utilization of Local Available material in Base and Sub-base Layer for Pavement construction Completed  2016-08-01 2018-07-15 A. K. Anupam NIL